![]() |
브랜드 이름: | Upperbond |
모델 번호: | HLP2 |
MOQ: | 1 PC |
가격: | 협상 가능 |
배달 시간: | 10일이요 |
지불 조건: | L/C (신용장), 전신환, 웨스턴 유니온, 머니그램 |
1 | Item name | Embossed roller |
2 | Machine type | Packer |
3 | Machine model | HLP2 |
4 | Payment | TT/WU |
5 | Express | DHL/TNT/UPS |
6 | Delivery | Express |
7 | Term | EXW/CIF |
Quality Control
Testing ability of sand mold size and key parameters, semifinished product material and size, finished product size and air tightness
Strict incoming inspection, sample inspection, process inspection and outcoming inspection standards
Project Management
Project responsibility system- project engineer is responsible for the quality and delivery in the whole process, from early stage technical communication, production process follow-up to after-sales service.
Overall on-line monitoring records from production to inspection, real-time feedback processing
![]() |
브랜드 이름: | Upperbond |
모델 번호: | HLP2 |
MOQ: | 1 PC |
가격: | 협상 가능 |
포장에 대한 세부 사항: | 통 |
지불 조건: | L/C (신용장), 전신환, 웨스턴 유니온, 머니그램 |
1 | Item name | Embossed roller |
2 | Machine type | Packer |
3 | Machine model | HLP2 |
4 | Payment | TT/WU |
5 | Express | DHL/TNT/UPS |
6 | Delivery | Express |
7 | Term | EXW/CIF |
Quality Control
Testing ability of sand mold size and key parameters, semifinished product material and size, finished product size and air tightness
Strict incoming inspection, sample inspection, process inspection and outcoming inspection standards
Project Management
Project responsibility system- project engineer is responsible for the quality and delivery in the whole process, from early stage technical communication, production process follow-up to after-sales service.
Overall on-line monitoring records from production to inspection, real-time feedback processing